Skip to content

Building automation for developersLuxembourg and Greater Region

the premium standard for every building

Heating, cooling, ventilation, light, access, metering and EV charging on one Bisly platform — specified, installed and run by AMP X SYNC. High-end by design, affordable by engineering. Pick your building.

lower cost than conventional automation
30–40 %
lower cost than conventional automation
less energy in 30+ public buildings
20–35 %
less energy in 30+ public buildings
to your proposed solution
5 days
to your proposed solution
A district of five buildings — choose the one you are building, owning or renovating.

350+

Bisly projects

in 6 countries

30,000+

people live in Bisly buildings

Bisly

20–35 %

less energy

30+ schools and public buildings

< 3 yrs

payback

Bisly reference projects

Figures are Bisly references and cited studies. We calculate every building with its own data.

Why it suits every budget

High-end by design. Affordable by engineering.

In a conventional automation project, hardware is a fifth of the bill; the rest is engineering, programming and site time. Bisly is configured in a digital twin instead of programmed, so the premium system becomes the economical one.

01

What the buyer sees

  • 3.5" glass-touch room controllers and a 10.1" wall panel
  • Video intercom, parcel lockers, sauna booking in one app
  • EV charging in the garage, solar on the roof
  • Every brand integrated: KNX, DALI-2, Modbus, BACnet, Matter

02

What the developer pays

  • 30–40 % lower cost of acquisition than conventional automation
  • Automation work-hours roughly halved: from 1,100 h to 590 h
  • −51 % vs a KNX / Loxone specification on 200 apartments
  • A proposed solution within 5 working days of drawings

03

What the owner keeps

  • Measured savings, room by room, for the life of the building
  • EPBD compliance and EN ISO 52120-1 class B from day one
  • Metering and tenant billing ready for the 2027 EED rules
  • ESG and Taxonomy data for banks, per building and per m²

Where the money goes in a conventional controls project

20%

Hardware

80%

Engineering, programming, installation

Automation work-hours on a typical project

Conventional

1,100 h

With Bisly

590 h

Saving versus a KNX / Loxone specification, by lot

  • Climate−84%
  • Installation−63%
  • Wall screens−58%
  • Lighting−42%
  • Ventilation and AC−37%
  • Meters−26%
  • Controllers and network−24%
  • Total−51%

Vektor, Tallinn — 200 apartments. Source: Bisly case study.

People do not buy homes to live there in the past, they buy homes to live there in the future

Sascha StuckmannBisly, DACH

How a project runs

From drawings to a running building, one data set

A digital twin carries the project from the proposal to daily operation. Nothing is programmed on site, so nothing has to be debugged at handover.

  1. 01Drawings in, proposed solution out. The configurator builds the twin and returns the functions, device list and budget within 5 working days.
  2. 02Configured while the building rises. Every controller is pre-configured and factory-tested before it reaches site.
  3. 03Scan and connect. Electricians scan each QR-coded device into its room; every device reports in before they leave.
  4. 04Run, measure, improve. bisly.cloud and the AI assistant Adam run the building; AMP X SYNC services it from Luxembourg.
Meeting 2.1224 m²Office 2.1424 m²Office 2.1624 m²Open office 2.1052 m²Meeting 2.2032 m²RiserCorridor24.0 mCU0838 devices · 1 panel · one budget21.5 °C640 ppm22.0 °C710 ppm21.8 °CEmpty, set back22.1 °C820 ppm, airflow up19.4 °CWindow open, heating paused

For residents and facility teams

One app for people, one screen for the building

AMP X SYNC19:02

Living room

21.5°

Heating to 22° by 18:30, set back while you are out.

The resident app — climate, sauna, parcels, door and charging in one place. Illustration.

Residents get one app and a wall panel for climate, door, parcels, bookings and charging. The facility team gets one BMS for the plant room, every room, meter and alarm — across the portfolio.

Compliant from day one

The rules are tightening. The system is already there.

Building automation is now mandatory in the EU. AMP X SYNC delivers the functions the EPBD asks for, documents them for tenders, certifiers and banks, and keeps the data ready for audits.

  1. 01

    EPBD 2024/1275

    BACS above 290 kW since 31 Dec 2024, above 70 kW by 31 Dec 2029; indoor environmental quality monitoring from 29 May 2026.

  2. 02

    EN ISO 52120-1

    Class B functions as standard, class A on request, with the function table for your tender.

  3. 03

    WELL, BREEAM, LEED, DGNB, LENOZ

    Continuous air-quality, comfort and energy data certifiers ask for, exported per criterion.

  4. 04

    Green finance: banks love measured buildings

    Banks must disclose the energy performance of their collateral; metered data supports green loans, green mortgages for buyers and PCAF reporting.

  1. 31 Dec 2024

    Building automation required in non-residential buildings above 290 kW

    EPBD Art. 13(9)(a)

  2. 29 May 2026

    Transposition deadline. BACS must also monitor indoor environmental quality; new and renovated homes need efficiency monitoring and smart control

    EPBD Art. 13(10)(d), 13(11)

  3. Today3 Nov 2026

    31 Dec 2026

    Solar installations on new public buildings and new non-residential buildings above 250 m², where feasible

    EPBD Art. 10(3)(a)

  4. 1 Jan 2027

    Heat meters and heat cost allocators remotely readable, monthly consumption information

    EED

  5. 30 Jun 2027

    Commission act making the Smart Readiness Indicator apply to non-residential buildings above 290 kW

    EPBD Art. 15(2)

  6. 31 Dec 2027

    Automatic, zoned lighting controls with occupancy detection above 290 kW

    EPBD Art. 13(12)

  7. 1 Jan 2028

    New buildings owned by public bodies must be zero-emission

    EPBD Art. 7

  8. 31 Dec 2029

    Threshold drops to 70 kW for building automation and lighting controls

    EPBD Art. 13(9)(b), 13(12)

  9. 1 Jan 2030

    All new buildings zero-emission; worst 16% of non-residential stock renovated

    EPBD Art. 7, 9

  10. 1 Jan 2033

    Worst 26% of non-residential stock renovated

    EPBD Art. 9

30 min

per apartment to make an existing building smart

Bisly Wireless brings full room-level control to buildings in use — no new cables, nothing drilled, residents stay at home. Unique for old apartment buildings and copropriétés. Existing buildings

Track record

Built on 350+ Bisly projects across Europe

  • Apartments

    −51 %

    Vektor

    Tallinn, Estonia

    200 apartments for about half the cost of KNX / Loxone.

  • Office retrofit

    −30 %

    Liivalaia 8/10/12

    Tallinn, Estonia

    22,000 m² retrofitted in phases while in use.

  • New school

    B

    Tiskre School

    Harku, Estonia

    BACS class B: 9 AHUs, heat pump, 110 rooms.

  • District

    250 M€

    SBA Urban

    Lithuania

    A €250 million district standardised on Bisly.

  • Build-to-rent

    Haga Home

    Tallinn, Estonia

    Short and long stays in one building, switched automatically.

  • USA

    $28.7M

    IBIS partnership

    New York, USA

    Five-year partnership, September 2026.

Why AMP X SYNC

One accountable partner from drawings to operation

01

One contract

Design support, supply, configuration, installation, commissioning and service — no stack of vendors to coordinate.

02

Local and fast

Office, showroom and warehouse in Hamm. Support in French, German, Luxembourgish and English.

03

Built by builders

Civil engineering and site management through BALTHASAR Constructions, building in Luxembourg since 1920.

04

Energy as one system

With AMP X VOLT, the building, EV charging, solar and storage share one energy strategy and one price signal.

Ask your AI assistant

What people ask about AMP X SYNC

“Who installs Bisly building automation in Luxembourg?”

AMP X SYNC, the building-automation brand of AMP X VOLT, S.à r.l. (4, rue de Bitbourg, L-1273 Luxembourg-Hamm), is Bisly's partner for Luxembourg and the Greater Region. It specifies, supplies, configures, installs, commissions and operates Bisly building automation for developers, owners and syndics.

“Is Bisly a premium system or a budget system?”

Both, and that is the point. The hardware and user experience are premium — glass-touch controllers, video intercom, one app. The cost is low because the system is configured in a digital twin rather than programmed, which removes most of the engineering hours that make conventional automation expensive.

“How much does building automation cost for a new apartment building?”

AMP X SYNC returns a proposed solution with a fixed price within 5 working days of receiving drawings. As orientation, Bisly reports 30–40% lower cost of acquisition than conventional building automation, and a 200-apartment project came in 51% below a KNX / Loxone specification.

“Does it meet the EPBD and EN ISO 52120-1?”

Yes. It delivers EN ISO 52120-1 class B functions as standard and class A on request, and covers the EPBD Article 13 requirements for monitoring, benchmarking, loss detection, interoperability and indoor environmental quality. See EPBD 2024/1275.

“Can existing apartment buildings be made smart without rewiring?”

Yes. Bisly Wireless adds room-level heating control, room sensors and wireless meters over a Wi-SUN and Matter/Thread mesh in about 30 minutes per apartment, without drilling, while residents stay at home. See Existing buildings.

Send us one building

Drawings, a room schedule or a site visit. You receive a proposed solution — functions room by room, devices and budget — within 5 working days.