Compliance knowledge base
building automation that meets the rules — and proves it
Building automation is no longer optional in the EU. This is our map of what the rules ask for, when, and which function of the system delivers it. Checked against the published texts; last reviewed November 2026.
Last reviewed:
At a glance
Every rule, what it asks, how the system meets it
| Rule or label | What it asks for | How AMP X SYNC delivers it |
|---|---|---|
| EPBD 2024/1275, Art. 13 | BACS in non-residential buildings above 290 kW (since 31 Dec 2024) and above 70 kW (by 31 Dec 2029); monitoring, benchmarking, loss detection, interoperability; indoor environmental quality from 29 May 2026 | bisly.cloud BMS with trends, benchmarks, alarms and Adam; CO₂, temperature and humidity per room; open protocols |
| EPBD, Art. 15 — SRI | Smart Readiness Indicator to apply to non-residential buildings above 290 kW (Commission act by 30 Jun 2027) | Functions across all nine SRI domains, including EV charging with AMP X VOLT |
| EN ISO 52120-1 | Classes A to D for the energy impact of BACS | Class B as standard, class A on request, function table for tenders |
| Energy Efficiency Directive (EU) 2023/1791 | Remote-readable heat meters and allocators by 1 Jan 2027, monthly information; energy management systems above 85 TJ/year, audits above 10 TJ (Art. 11) | Wired and wireless M-Bus, tenant allocation, billing exports; data for ISO 50001 |
| EU Taxonomy 7.5 and 7.7 | Installing BACS and metering is an enabling activity; large non-residential buildings must be operated through energy performance monitoring and assessment | The BMS and its exports are the evidence |
| Public buildings — EPBD Art. 7, 10, 21; EED Art. 5–7 | Zero-emission new public buildings from 1 Jan 2028, solar from 2026, 3 % of public floor area renovated and −1.9 % final energy every year, energy certificates on display | Measured data per building, wireless retrofit while in use, one portfolio report |
| WELL, BREEAM, LEED, DGNB, LENOZ | Air-quality and comfort monitoring, sub-metering, controls, commissioning records | Continuous data and documentation per credit |
| Cybersecurity: RED delegated act, Cyber Resilience Act, GDPR | Secure radio equipment (since 1 Aug 2025); secure connected products (reporting from 11 Sep 2026, full from 11 Dec 2027); personal data protection | Certificates per node, encrypted meshes, outbound-only HTTPS, isolated automation LAN |
Timeline
The deadlines, to scale
31 Dec 2024
Building automation required in non-residential buildings above 290 kW
EPBD Art. 13(9)(a)
29 May 2026
Transposition deadline. BACS must also monitor indoor environmental quality; new and renovated homes need efficiency monitoring and smart control
EPBD Art. 13(10)(d), 13(11)
- Today3 Nov 2026
31 Dec 2026
Solar installations on new public buildings and new non-residential buildings above 250 m², where feasible
EPBD Art. 10(3)(a)
1 Jan 2027
Heat meters and heat cost allocators remotely readable, monthly consumption information
EED
30 Jun 2027
Commission act making the Smart Readiness Indicator apply to non-residential buildings above 290 kW
EPBD Art. 15(2)
31 Dec 2027
Automatic, zoned lighting controls with occupancy detection above 290 kW
EPBD Art. 13(12)
1 Jan 2028
New buildings owned by public bodies must be zero-emission
EPBD Art. 7
31 Dec 2029
Threshold drops to 70 kW for building automation and lighting controls
EPBD Art. 13(9)(b), 13(12)
1 Jan 2030
All new buildings zero-emission; worst 16% of non-residential stock renovated
EPBD Art. 7, 9
1 Jan 2033
Worst 26% of non-residential stock renovated
EPBD Art. 9
Building check
Which duties apply to your building?
Five answers. The result lists the duties, the dates and the article they come from.
Which building-automation duties apply to your building?
What applies
- 01
Building automation (BACS) — required by 31 December 2029
Continuous monitoring, logging and analysis of energy use, benchmarking, loss detection and interoperability for systems above 70 kW (EPBD Art. 13(9)(b), 13(10)). Installing now avoids a second project and starts the savings earlier.
- 02
Indoor environmental quality monitoring — from 29 May 2026
BACS must be able to monitor indoor environmental quality (EPBD Art. 13(10)(d)). Temperature, humidity and CO₂ per room are standard.
- 03
Automatic lighting controls — by 31 December 2029
Zoned, with occupancy detection (EPBD Art. 13(12)).
- 04
Zero-emission building standard
New buildings: public-owned from 1 Jan 2028, all from 1 Jan 2030 (EPBD Art. 7). Non-residential zero-emission buildings need devices that measure and control indoor air quality (Art. 13(5)).
- 05
Room-by-room temperature control
Self-regulating devices per room or zone in new buildings, and in existing buildings when the heat generator is replaced (EPBD Art. 13(3)).
LULuxembourg transposed the 2018 BACS duty in the règlement grand-ducal of 9 June 2021; the 2024 recast is being transposed. We confirm the national text for each project.
Indicative, based on Directive (EU) 2024/1275 and the Energy Efficiency Directive as published. Not legal advice.
Luxembourg and the Greater Region
How the duty reaches each country
EU directives apply through national law. We confirm the applicable text for every project before quoting dates.
- 01
Luxembourg
The 2018 EPBD building-automation duty was transposed by the règlement grand-ducal of 9 June 2021 on the energy performance of buildings. Transposition of the 2024 recast (deadline 29 May 2026) is in preparation.
- 02
France (Lorraine)
The décret BACS requires automation in non-residential buildings above 290 kW and, from 2030, above 70 kW.
- 03
Germany (Saarland, Rhineland-Palatinate)
GModG § 56 (formerly GEG § 71a): 290 kW now, 70 kW by 31 December 2029, EN ISO 52120-1 class B functions as the benchmark.
- 04
Belgium (Wallonia)
Regional energy-performance (PEB) rules transpose the EPBD; requirements differ between Wallonia, Brussels and Flanders.
Cybersecurity and data
Connected buildings, secured by design
01
Radio equipment
Since 1 August 2025 radio equipment sold in the EU must meet the cybersecurity requirements of the RED delegated act. Bisly Wireless uses a certificate per Wi-SUN node (802.1X / EAP-TLS) and Matter device attestation.
02
Connected products
The Cyber Resilience Act adds vulnerability reporting from 11 September 2026 and full obligations from 11 December 2027. Ask every BACS vendor how they meet it.
03
Network design
An isolated automation LAN, one outbound HTTPS uplink, no inbound ports; local control continues without the internet.
04
Personal data
Occupancy and consumption data can be personal data under the GDPR. Access is role-based; data stays with the building owner.
Questions
Compliance questions
Which buildings must have building automation under the EPBD?
What must a BACS be able to do under the EPBD?
Do residential buildings have to be automated?
Which EN ISO 52120-1 class should a new building target?
Is this legal advice?
Sources
- 01Directive (EU) 2024/1275 on the energy performance of buildings (recast), EUR-Lex
- 02Directive (EU) 2023/1791 on energy efficiency (recast), EUR-Lex
- 03European Commission — Smart Readiness Indicator
- 04eu.bac — EPBD transposition and BACS requirements
- 05Luxembourg — règlement grand-ducal of 9 June 2021 on energy performance of buildings (Legilux)
- 06Bisly — regulation overview